The aim of this project is to assess the load carrying capacity of the Glomman Bridge outside of the Swedish city Örebro. The Glomman Bridge is an unreinforced concrete single span arch bridge with backfill. The bridge was constructed in 1923 on assignment from the Swedish National Railways (SJ).