(Civil Project) Capacity assessment of a single span arch bridge with backfill


The aim of this project is to assess the load carrying capacity of the Glomman Bridge outside of the Swedish city Örebro. The Glomman Bridge is an unreinforced concrete single span arch bridge with backfill. The bridge was constructed in 1923 on assignment from the Swedish National Railways (SJ).

(Management Project) Marketing Plan for Design Jewelry



Jewelry designers might not be as customer-centered as Kotler recommend. Additionally, they are not constantly seeking to grow and make the most profit out of satisfying consumer needs better than competitors. However, it is imperative even for an individual designer to examine what the customers want and demand as well as think of a plan to satisfy this demand.

(Mechanical Project) Effects of Mach Cruise Number on Conventional Civil Jet Aircraft Sizing



The objective with this work was to examine the effects of fitness ratio, lift over drag, lift coefficient at cruise, winglet span, wing sweep angle, wing aspect ratio, wing area and weights with respect to Mach number for a conventional business jet capable of 18 passengers. The cruise speed study range from Mach 0.88 to 0.99.

(Computer Project) Object-Oriented Development of a Smart Phone Application from an Existing Service


Lissly.com is a monitoring service that monitors the presence of brands, companies and people in social media. As a complement to the web based tool, an application for smartphones is needed.

(Electronics Project) Assembly of a UAV (Unmanned Aerial Vehicle): hardware design of a UAV


This project is dedicated to assemble the hardware system of a UAV (Unmanned Aerial Vehicle) in order to prepare the platform for an autonomous flight in the air for a given path through the pre-programmed check points. A UAV is an aircraft that contains sensors, GPS, radio system, servomechanisms and computers, which provide the capability of an autonomous flight without a human pilot in the cockpit.

(Civil Project) 30 Flats in Halmstad


A construction project including planning, cost estimation and design of a ”30 Flats in Halmstad” on a property in the city of Halmstad.
Source: Halmstad University
Author: Pascual Beneyto, Alejandro

(Mechanical Project) Optimization of the Polishing Procedure using a Robot assisted Polishing Equipment


Today, manual polishing is the most common method to improve the surface finish of mould and dies for e.g. plastic injection moulding, although it is a cumbersome and time-consuming process. Therefore, automated robots are being developed in order to speed up and secure the final result of this important final process. 

(Management Project)How to Perform Market Orientation in New Product Development


In  turbulent  environments,  the  infused  marketing  function  has  become  an  essential and natural part in the firms’ new product development (NPD). Some scholars define NPD as the transformation of amarket opportunity into a product  as a result of the coupling of market assumptions with technological possibilities. 

(Computer Project) Switched Multi-hop Priority Queued Networks-Influence of priority levels on Soft Real-time Performance


In the last few years, the number of real-time applications has increased. These applications are sensitive and require the methods to utilize existing network capacity efficiently to meet performance requirements and achieve the maximum throughput to overcome delay, jitter and packet loss. 

(Electrical/Electronics Project) Low Noise Amplifier for Radio Telescope at 1: 42 GHz


This is a part of the project “Radio telescope system” working at 1.42 GHz, which includes designing of patch antenna and LNA. The main objective of this project is to design a two stage low noise amplifier for a radio telescope system, working at the frequency 1.42 GHz. Finally our aim is to design a two stage LNA, match, connect and test together with patch antenna to reduce the system complexity and signal loss.

Top PROJECTS Download